How Long Does Drywall Installation Take in a New Construction Home?

When building a new home, drywall is one of the major steps that helps the project start looking like a finished interior. Once framing, mechanical work, and inspections are complete, drywall installation can begin.

So, how long does drywall installation take in a new construction home? The answer depends on the size of the house, the number of rooms, ceiling height, custom details, crew size, and the level of finish required.

Bill’s Drywall provides new construction drywall services for residential and commercial projects throughout Chicagoland and surrounding areas. Their full-time crews handle everything from small homes to large estates and multi-level buildings, with a focus on completing work on time and on budget.

Drywall Installation Happens in Several Stages

Drywall work involves much more than simply attaching panels to walls.

A typical new construction drywall project includes:

  • Hanging drywall
  • Fastening panels
  • Taping seams
  • Applying joint compound
  • Allowing compound to dry
  • Adding additional coats
  • Sanding
  • Finishing
  • Completing any texture or custom details

Bill’s Drywall provides installation, mudding, taping, sanding, and finishing as part of its residential and new construction drywall services.

Each stage must be completed properly before the next one begins, which is why the entire process usually takes longer than the initial hanging phase.

How Long Does It Take to Hang Drywall?

The hanging portion can move quickly when an experienced crew is working on the project.

Bill’s Drywall uses full-time in-house teams rather than subcontracting its work. Having established crews can help projects move efficiently because the team is accustomed to working together and handling both standard and custom drywall installations.

The company’s own customer reviews include an example where drywall hanging on a basement project was completed in two days before the taping, sanding, finishing, and cleanup continued on schedule. That is one project example, not a guaranteed timeline for every new home.

Larger homes, tall ceilings, complex layouts, or detailed architectural features may require additional time.

Mudding and Taping Add Time to the Schedule

After drywall is hung, seams and fasteners need to be covered.

Joint tape is applied to seams, followed by multiple coats of joint compound. Each layer generally needs time to set or dry before another coat can be applied and sanded.

This stage is important because the quality of the finish determines how smooth the walls will look once they are painted.

Bill’s Drywall handles both mudding and taping as part of its complete drywall services, helping keep the project moving through each phase with one crew.

Custom Drywall Can Extend the Timeline

Not every new construction home has simple flat walls and ceilings.

Custom features can increase the amount of labor involved. Bill’s Drywall provides specialty drywall work including:

  • Layered ceilings
  • Radius corners
  • Radius walls
  • Groin vaults
  • Curved turrets
  • Radius staircases
  • Texture work
  • Level 5 finishes

These details require additional measuring, cutting, forming, and finishing compared with a standard drywall installation.

A home with custom architectural features will typically take longer than a similarly sized house with straightforward walls and ceilings.

Home Size Makes a Big Difference

A small new construction home and a large multi-story residence are very different projects.

Bill’s Drywall works on residential homes, production homes, estates, apartment buildings, schools, and commercial spaces. Their team has the staffing and experience to handle projects of different sizes.

Other factors that can affect the drywall schedule include:

  • Total square footage
  • Number of rooms
  • Ceiling height
  • Stairwells
  • Vaulted ceilings
  • Number of corners
  • Specialty finishes
  • Jobsite accessibility

That is why an accurate timeline is usually developed after reviewing the plans.

Planning Ahead Helps Keep Construction Moving

Drywall sits between major construction phases.

Once finishing is complete, painters, trim carpenters, cabinet installers, flooring crews, and other trades can continue toward final completion.

Bill’s Drywall begins new construction projects by reviewing blueprints or PDF plans and preparing a competitive estimate. Their goal is to create a plan that allows the drywall portion of the project to stay on schedule and within budget.

Providing plans early can also make it easier to account for specialty ceilings, unusual layouts, and other details before installation begins.

Request a New Construction Drywall Estimate From Bill’s Drywall

There is no single number of days that applies to every new construction drywall project. A straightforward home may progress quickly, while a larger house with high ceilings, custom details, or a Level 5 finish will naturally require more time.

Bill’s Drywall provides complete new construction drywall services including hanging, taping, mudding, sanding, finishing, and specialty drywall work. Their in-house teams handle projects throughout Illinois, Indiana, and Wisconsin.

Call 708-478-2200 or send Bill’s Drywall your blueprints or PDF plans to request a free estimate and get a more accurate timeline for your new construction home.